TÜRKÇE
  Updated: 04/03/2022

Sivas Kızılırmak Right and Left Banks Wastewater Collector Project

 

GENERAL INFORMATION
 

Project title
 

Sivas Kızılırmak Right and Left Banks Wastewater Collector Project

Priority area
 

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Sivas Municipality

Co-Beneficiary
 

-

Duration

26 months

October 2020 – December 2022

EU contribution (Euro)

15.550.000

 

 

 

 

PROJECT SUMMARY

Brief description of the project and main objectives
 

Construction of new wastewater collector lines and connection to the existing wastewater treatment plant

Contributing to the improvement of public health by reducing the pollution load in Kızılırmak River

Location

Sivas

Achievements / expected outputs

With the construction of Kızılırmak right and left banks wastewater collectors, the needs of the region in terms of wastewater treatment services will be met until 2047.



Updated: 04/03/2022 / Hit: 4,161