TÜRKÇE
  Updated: 04/03/2022

Bismil Wastewater Project

 

 

GENERAL INFORMATION
 

Project title
 

Bismil Wastewater Project

Priority area
 

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Diyarbakır Water and Wastewater Administration (DİSKİ)

Co-Beneficiary
 

-

Duration

30 months

June 2020 – December 2022

EU contribution (Euro)

11.427.0000

 

 

 

 

PROJECT SUMMARY

Brief description of the project and main objectives
 

Construction of wastewater treatment plant

Improving the water quality of Dicle River via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.

Overcoming the operational problems in the sewerage system through partial replacement of the wastewater network.

Location

Bismil (Diyarbakır)

Achievements / expected outputs

Wastewater treatment plant and wastewater collection system.

With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.

 



Updated: 04/03/2022 / Hit: 3,791